After saturated conditions weaken a 3 foot thick concrete base under a long span of rail track, URETEK crews work in tight conditions with over 12,000 volts buzzing overhead to stabilize the compromised track using structural grade polymer.

Share:
  • Facebook
  • Twitter
  • Google Bookmarks
  • LinkedIn